SC
SC-012 — Quote Pricing
Engineering preview · Client-side · Deterministic Decimal engine · Not for production approval
Price
Configuration
Job shop
Production run
Material cost
i
Raw material cost
Direct material for the job before scrap allowance.
currency
Scrap rate
i
Expected scrap fraction
0.10 = 10% of material lost. Material is grossed up by (1 + scrap).
ratio
Labor hours
i
Direct labor hours
Total touch-labor on the job.
h
Labor hourly cost
i
Fully-loaded labor rate
Use SC-010 true hourly cost here, not net wage.
currency/h
Machine hours
i
Machine runtime
Spindle / cycle time on equipment.
h
Machine hourly cost
i
Machine rate
Depreciation + power + tooling per hour.
currency/h
Setup cost
i
One-off setup
Fixturing / programming, amortized per job.
currency
Overhead rate
i
Overhead on conversion cost
Applied to labor + machine (facilities, admin).
ratio
Financing rate
i
Cost of money / WIP
Working-capital charge on the job cost.
ratio
Target margin
i
Profit margin on sell price
0.20 = 20% of sell price is profit. sell = total / (1 - margin).
ratio
Quantity
i
Batch size
Setup is spread across the batch; unit price = sell / qty.
pcs
Live Result — Sell Price
—
Generate Report
Reset
Engineering Report Ready
Configure inputs on the left panel.
All values update in real-time.
Click "Generate Report" for a predicted analysis.