Zum Hauptinhalt springen
Datenbank-Gutachtergremium: Prof. Dr. Wil Schilders [MathSciNet:155995] | Prof. Dr. Carsten Carstensen [MathSciNet:263782] | Prof. Dr. Neela Nataraj [MathSciNet:613458]
Standard: VDI 2067, ECMI Guidelines, ISO 15663 | Zuletzt aktualisiert: 18.6.2026 | Fälle gesamt: 4
Datensatz-IDrepresentative-construction-bid-margin
BrancheConstruction / Bid Margin
EvidenzstufeRepräsentatives Szenario (kein verifiziertes Kundenergebnis)
Zugehöriges ToolChange Order Impact Analyzer

Representative construction bid margin scenario

Repräsentatives Szenario — modellierte Exposition, kein verifiziertes Kundenergebnis.

Problem

A subcontractor prices labor and materials on the base bid but under-reserves for mobilization, inspection cycles, and schedule slip — margin looks intact on paper until field burn catches up.

Eingabesatz

  • Base contract $620,000, bid margin target 18%
  • Crew 8, field burn $2,850/day, 12-day slip risk on critical path
  • Allowance $18,000 for rework / re-inspection

Versteckter Verlust

Delay burn and re-mobilization are excluded from the headline bid — modeled hidden exposure ~$34,000–$42,000 on this illustrative schedule input.

Schedule & mobilization margin leak

Berechnungsergebnis

Headline bid implies ~17.5% margin; loaded field burn and slip reserve pull modeled net margin toward ~11–13% vs the 18% target (representative simulation).

Contract value minus loaded direct cost, schedule-disruption reserve, and remobilization buffer; net margin compared to target band.

Empfohlene Maßnahme

Increase bid reserve or tighten schedule assumptions before tender submission if modeled net margin falls below target.

Geschätzte Auswirkung: Modeled margin compression band on this synthetic bid — not verified project savings.

Methodik-Hinweis

Deterministic construction overrun model with user-entered burn and slip days — illustrative framing for bid review, not a guarantee of field outcome.

  • Burn rate flat across slip days
  • Rework allowance entered explicitly
  • Representative scenario — modeled exposure, not a verified customer outcome.

Zugehöriges Tool

Change Order Impact Analyzer

This case study illustrates how SectorCalc tools structure inputs and surface loss types. It is not financial, legal, or engineering advice. Estimated impact ranges are illustrative only.

← Zurück zum Index