Record IDCS-2026-002
CompanyIzmir CNC Workshop
CityIzmir
CountryTurkey
IndustryManufacturing / CNC machining
Project duration6 months
PublishedJune 1, 2026
Read time4 min read
Savings (€)85,000

CNC shop raised OEE from 18% to 61%

How unplanned downtime, setup time, and quality losses were reversed

Customer & challenge

A CNC job shop running 12 machines for batch production had an OEE of 18%. Unplanned downtime, long setups, and quality losses were eroding throughput — roughly 40 hours of unplanned stops each month.

Solution

SectorCalc OEE Downtime Calculator mapped stop categories. SMED Changeover Optimizer cut setup from 45 minutes to 12. Scrap rate dropped from 8% to 3% after rework buffers were priced into jobs.

Results

MetricBeforeAfter
OEE18%61%
Setup time45 min12 min
Scrap rate8%3%
Annual savings$0$85,000

Tools used

Statement

With SectorCalc we tripled shop-floor visibility. We now see which machine stopped and why within minutes.

Ali Yilmaz, Production Manager, Izmir CNC Workshop

Composite illustrative scenario based on typical sector patterns — not a verified audit of the named business. Not financial, legal, or engineering advice.